Stockholm Metro - Green Line

Green Line facts

  • Construction of the Green Line started on the 1st October 1950
  • The Green Line reached it's current completion in 1994
  • There are 41 km of track.
  • Around 550,000 passengers use the Green Line each day
  • There are 3 intercrossing lines on the Green Line.
  • Line T17 between Åkeshov and Skarpnäck.
  • Line T18 between Alvik and Farsta Strand.
  • Line T19 between Hässelby Strand and Hagsätra.
  • The lines connect between Gillmarsplan and Alvik.

Artistic stations to visit

  • T-centralen
  • Odenplan
  • Fridhemsplan
  • Thorildsplan (pictured)

Mobirise

* This site is only an informational guide in English to the Stockholm Metro System and not affiliated to SL or any authorities.
© Copyright 2019 StockholmMetro.com - All Rights Reserved.